Thursday, December 30, 2010

Week Seven: Extreme Mess and Dumpster Delivery

We've filled bags and bags with drywall, debris, and tile, and have started to quickly fill a dumpster. 

Mess-o-potamia!


The main bathroom and the utility room are in an extreme state of deconstruction, and there is a rather scary hole in the floor between the two rooms. Some DIY plumbing over the many years has caused a lot of rot in the subfloor, and it all needs to come out.

Before:


After:


The hole in the floor where a very DIY shower stall once was. Water has damaged the floor joists.


We're going to be spending a lot of time in the crawl space ... beer will be needed!



We did get to relax in front of the fire -- our first fireside meal of bread, cheese, sausage, and beer. If we really use our imagination, we can almost picture everything being finished one day!





No comments:

Post a Comment

Note: Only a member of this blog may post a comment.